Trackwork

Blogs related the design and build of track, turnouts and crossings.

Breaking In the Tracks

Really? You break in a locomotive, but tracks? – Let me explain. My CNJ Bronx Terminal has  28 turnouts and 7 crossovers. When I built the individual pieces I always tested a single two- or three-way turnout and when an entire section was complete I’d also test the finished section. But those tests were never exhaustive: […]

Breaking In the Tracks Read More »

Adding the Last Spike

Finally, by adding the last three-way turnout for tracks 9 and 10, I was able to close the loop. My track work for the CNJ Bronx Terminal is almost complete! The last section fits nicely with tracks already in place, including with the quadruple diamond section. I was worried that somehow the ends wouldn’t meet. With hand-laid track a

Adding the Last Spike Read More »

Getting Started

Eager to get things done, I started the detail design and construction of some of the track work. I figured out that the Northwest section of the freight yard would be the easiest to start with. It had a few simple straight and curved turnouts but it also had the first challenge, a triple diamond where

Getting Started Read More »